Compute

Slowdown? What Server Slowdown?

The IT sector was bracing for a slowdown in system spending a few weeks ago, but it doesn’t look much like a slowdown has materialized, despite warnings from server adapter card maker QLogic that its business had slowed because the ramp for Intel’s “Haswell” Xeon E5 v3 processors and their “Grantley” server platform was not as fast as QLogic hoped.

Compute

Opening Up And Shaking Up Datacenter Designs

The hyperscalers of the world have taught data processing organizations many important lessons over the past decade, and the two most important ideas are that you have to measure everything and use metrics to drive both hardware and software engineering, top to bottom, from the disk drive and memory stick all the way out to the power substation that feeds the datacenter.